EN
The flue gas cleaning (FGC) project constructed by Huaxing for Anping Waste-to-Energy plant in Hengshui, Hebei passed 72+24 hours trial operation
2023.01.30
The FGC project  constructed by Huaxing for Anping waste incineration power plant in Hengshui, Hebei passed 72+24 hours trial operation on August  01, 2021.
The plant has an average waste treatment capacity of 800 t/d, construction of 2x400t/d mechanical grate waste incineration production line, equipped with 1x18 MW steam turbine generator. The FGC process applied "in-furnace SNCR + semi-dry rotary spray + Sodium hydroxide solution injection system + dry method with dry powder injection + activated carbon adsorption + bag filter + wet reserved + SCR reserved + fly ash conveying, storage and stabilization process". It is an EPC project of Huaxing.
The achievements of Huaxing East in Hebei Province include Baoding phase I & II, Hengshui, Anping, Dingzhou, Cangzhou phase I, Shijiazhuang, Xingtang, Caofeidian, Weichang, Shunping, Tangshan phase I & II, North Zhangjiakou, Gu'an, Sanhe, Xianghe, Luanzhou, Shahe, Xia Nenxin of Shijiazhuang, etc.
For more information, please click or scan below!

Follow us!