The FGC System of Xiapu MSW WtE Plant in Ningde, Fujian Province, undertaken by HEPT, has passed the 72+24 hour trial operation
2026.05.26
The FGC System of Xiapu MSW WtE Plant in Ningde, Fujian Province, undertaken by HEPT, has passed the 72+24 hour trial operation since 21st. Nov 2025.
The designing capacity of this project is 600 tons of household waste per day, equipped with 2×300t/d waste incinerator with 1×12MW condensing turbine generator set. Flue gas treatment adopts the flue gas cleaning processes of "in-furnace denitrification (SNCR) + rotating spray reaction tower + dry spray system + activated carbon spray system + bag dust collector + fly ash transportation, storage and stabilization process" to be available on all equipments supplied by our compnay.
Huaxing East’s references in Fujian Province includes: Shishi Quanzhou, southern Zhangzhou, Jinjiang Quanzhou, Anxi Quanzhou, Dehua Quanzhou, Pujiangling Zhangzhou, Jianyang Nanping, northern Zhangzhou, Hongmiaoling Fuzhou, Sanming (Phase I & Phase II), Shanghang Longyan, Xiapu Ningde, Changting Longyan and many other projects.