EN
The FGC System of the Keshan MSW WtE Plant in Qiqihar, Heilongjiang Province, undertaken by HEPT, has successfully passed the 72+24 hour trial operation
2026.05.26
The FGC System of the Keshan MSW WtE Plant in Qiqihar, Heilongjiang Province, undertaken by HEPT, has successfully passed the 72+24 hour trial operation since 4th. Feb 2026.
The design scale of this project is to process 600tonnes of household waste per day, equipped with 1x600t/d mechanical grate furnaces. The flue gas treatment adopts the flue gas cleaning process of "SNCR (not within the scope of this contract)+SDA semi dry method+dry method+activated carbon injection+bag filter+fly ash conveying and storage", which is our EPC project.
Huaxing East Co's performance in Heilongjiang Province includes multiple projects such as Qitaihe, Jixi, Jiamusi Huanan, Hegang, Suihua, Qiqihar, Qiqihar, Keshan, Harbin Bayan, etc.
HEPT has been committed to building itself into a leading enterprise in core equipment for solid waste treatment. Relying on its strong manufacturing capacity and professional equipment manufacturing capabilities, HEPT will assist leading investment groups and engineering companies both at home and abroad in bringing advanced incineration technologies and equipment to the global market.

For more information, please click or scan below!
Follow us!