EN
The FGC System of Xiapu MSW WtE Plant in Ningde, Fujian Province, undertaken by HEPT, has passed the 72+24 hour trial operation
2026.05.26
The FGC System of Xiapu MSW WtE Plant in Ningde, Fujian Province, undertaken by HEPT, has passed the 72+24 hour trial operation since 21st. Nov 2025.
The designing capacity of this project is 600 tons of household waste per day, equipped with 2×300t/d waste incinerator with 1×12MW condensing turbine generator set. Flue gas treatment adopts the flue gas cleaning processes of "in-furnace denitrification (SNCR) + rotating spray reaction tower + dry spray system + activated carbon spray system + bag dust collector + fly ash transportation, storage and stabilization process" to be available on all equipments supplied by our compnay.
Huaxing East’s references in Fujian Province includes: Shishi Quanzhou, southern Zhangzhou, Jinjiang Quanzhou, Anxi Quanzhou, Dehua Quanzhou, Pujiangling Zhangzhou, Jianyang Nanping, northern Zhangzhou, Hongmiaoling Fuzhou, Sanming (Phase I & Phase II), Shanghang Longyan, Xiapu Ningde, Changting Longyan and many other projects.
HEPT has been committed to building itself into a leading enterprise in core equipment for solid waste treatment. Relying on its strong manufacturing capacity and professional equipment manufacturing capabilities, HEPT will assist leading investment groups and engineering companies both at home and abroad in bringing advanced incineration technologies and equipment to the global market.

For more information, please click or scan below!
Follow us!